Things You'll Need To Know:
-
Application Options
- - High-quality brush
- - Roller with 1/2" nap
- - Pump sprayer
- - Airless sprayer (.011 – .015 fluid tip, 700 – 800 psi)
-
Application Tips
- - To avoid lap marks, always work the entire length of a board while maintaining a wet edge. Never stop application in the middle of the board.
- - Vertical surfaces should be coated from top to bottom.
- - Do not saturate or puddle on horizontal surfaces.
-
Cleanup
- - Clean tools with warm, soapy water.
-
Important Notes
- - Wear safety glasses.
- - Do not apply in direct sunlight or on hot surfaces.
- - Flood Multi-Surface Clear is for exterior use only; do not use it indoors.
-
Weather Requirements
- - Apply when air and surface temperatures are 50°F to 90° F (10° C to 32° C) and will remain above 50° F (10° C) for the next 48 hours.
- - Do not apply if wet weather is expected within 48 hours.
Step-by-step instructions:
- 1. Cover everything you do not wish to coat, including plants.
- 2. Make sure the wood surface has been properly prepared and is completely dry.
- 3. Do not mix with any other coating, paint or stain products, and do not thin the product.
- 4. Stir the product before and periodically during application.
- 5. Apply an even coat with a brush, roller, or a low-pressure garden-type sprayer or spray equipment, avoiding heavy application. Application by brush is recommended. When applying by roller or spray, always back-brush for best results.
- 6. A second coat may be applied wet-on-wet before the first coat dries.
- 7. Allow the finish to dry 24 to 48 hours.